This is a first selection that follows the Rexnord catalogue method. It does not choose attachments, sprockets, take-up or the drive, and drive-chain selection is not included. Confirm the chain with Rexnord before you order.

00

Start Here: Choosing a Conveyor or Elevator Chain

A conveyor chain is chosen on its pull, not on power in the way a drive chain is. You work out the total pull in the chain from the material, the weight of the moving parts and the friction, add allowances for the duty and the speed, and pick a chain whose rated working load is above the result. This page follows the method in the Rexnord and Link-Belt Engineered Steel Chain catalogue (468B).

1

Describe the conveyor or elevator

Choose a bulk conveyor class or a bucket elevator, then enter the length, rise, speed, material and sprocket teeth.

Fill section 01 →
2

Read the chain pull and power

The tool works out the total chain pull and the head-shaft power from the Rexnord formulas, then the design working load per strand.

See section 02 →
3

Shortlist chains

Every loaded chain whose rated working load is above the design working load is listed, with the chain’s own weight put back into the pull.

See section 03 →
4

Check the reference factors

Friction factors, material factors, speed and service factors are printed so you can see what the tool used.

See section 04 →
5

Confirm with the maker

Attachments, sprockets, take-up, wear strips and the drive are still to be chosen. Confirm the chain and its attachments with Rexnord.

Common mistakes

Using the breaking strengthUse the rated working load, not the ultimate strength. The rated working load already carries the safety margin for a normal conveyor. Ultimate strength is for comparison only.
Forgetting the weight of the chainThe chain, the flights and the attachments all move with the load, and the return run weighs as much as the carrying run. Do the first pass with an estimate, then repeat it with the real chain weight.
Taking one strand to carry everythingTwo strands do not share the load equally. The method multiplies the load per strand by 1.2 to cover this.
Using a few sprocket teeth at speedA sprocket with 6 to 8 teeth makes the chain pull jump with each tooth. The speed factor can be 2 or more. Use 12 or more teeth where you can.
Mixing the classes upA rolling chain (rollers) and a sliding chain have very different friction. Class 2, 4 and 4A are rolling; 1, 1A and 3 are sliding.
Treating cast and welded chains as elevator chainRexnord does not recommend cast, cast combination or welded steel chain for elevator service.
01

Conveyor Data

Enter the conveyor in metric units. The tool converts to the pound and foot units of the catalogue formulas, and shows the answers in kN and kW. Pick the type first; the fields change to suit it.

Worked example (from the catalogue)

A horizontal scraper-flight conveyor carries bituminous coal in a steel trough: 100 ft (30.5 m) between centres, 170 US tons/h (154 t/h) at 100 ft/min (30.5 m/min), with a 12-tooth sprocket, two strands of Rexnord SR196 chain rolling on steel, flights of 5 lb/ft, coal 6 in deep against the trough sides, 16 hours a day. The catalogue gets a chain pull of 3,395 lb and a design working load of 2,444 lb per strand, below the 2,600 lb of SR196. The button fills it in, and the shortlist should put SR196 first.

Chain sliding or rolling, and material sliding or carried.
Strands share the load; the method adds 1.2 for unequal sharing.
m, between the shaft centres
m, head above tail. For an elevator, the centre distance.
m/min
12 is the catalogue reference. If not decided, leave 12.
Friction factors come from the catalogue table.
kg/m³. Filled from the catalogue weight table where one is listed.
Bulk material by capacity, or unit loads by mass per metre.
tonnes per hour (metric)
kg/m. Used if you chose mass per metre.
mm. Zero for flat slats with no side rubbing.
kg per metre of conveyor, all strands
kg/m: chains, flights and attachments. Leave empty to estimate.
Chain friction factor f1. The catalogue gives 0.3 to 0.5 for unlubricated steel and 0.15 to 0.4 for UHMW.
Rolling friction factor fr.
Bushing outside diameter ÷ roller outside diameter. f1 = fr × this. The catalogue example is 0.625 in ÷ 2 in.
litres, struck volume
m
kg each, empty
m
From the catalogue.
N, total, from the take-up
kg/m, all strands, for the headline result. The shortlist uses each chain’s own weight.
Service factor, with the hours per day. Reversing under load needs the maker.
8 to 10 h uses the lower column; more than 10 h uses the 24 h column.
Adds 1.0, 1.1 or 1.2 to the service factor.

Shortlist filters

mm. Pitch is often fixed by the attachment spacing; 100 to 150 mm is a common compromise.
mm. Leave 0 for no limit.
02

Chain Pull, Power and Design Load

The total chain pull Pm is the highest tension in the chain, taken for static conditions. The service and speed factors cover shocks and the pulsation of the chain over the sprocket. If the class changes between horizontal and inclined sections, work each section separately and add the pulls.

03

Chain Shortlist

Chains from the Rexnord and Link-Belt catalogue whose rated working load is above the design working load. Cast and drop-forged chains use the cast-chain speed factor. Tick the families you want in section 01.

04

Reference Tables

The factors the tool uses, as printed in the Rexnord and Link-Belt 468B catalogue. Speeds in the speed-factor table are in feet per minute (50 ft/min is 15 m/min, 400 ft/min is 122 m/min).

Formulas

CaseFormula (lb, ft, in)
Class 1, 1A, 2, horizontal (Y/X below f1)Pm = X(2f1W + f2M + h²/c) + MY
Class 1, 1A, 2, inclinedPm = X(f1W + f2M + h²/c) + Y(W + M)
Class 3, 4, 4A, horizontalPm = f1X(2W + M) + MY + h²X/c
Class 3, 4, 4A, inclinedPm = (M + W)(f1X + Y) + h²X/c
Power, horizontalHP = 1.15 S Pm ÷ 33,000
Power, inclinedHP = 1.15 S (Pm − P1) ÷ 33,000, with P1 = W(Y − f1X)
Rolling frictionf1 = fr × da ÷ dr
Material per footM = TPH × 33.3 ÷ S
Estimated chain weightW = 0.0015 × total material weight on the conveyor (classes 1, 1A, 2, 3) or 0.0005 × it (classes 4, 4A), plus the flights
Design working loadPm × service factor × speed factor, times 1.2 ÷ strands for several strands
Bucket elevator pullPm = 0.5 Pt + M K D + Y(M + W)
Bucket elevator powerHP = 1.15 S (M D K + M Y) ÷ 33,000

Friction of the chain

Chain sliding onFriction factor f1
Steel track, unlubricated0.3 to 0.5
Steel track, lubricated0.2
Hard wood0.5
UHMW polyethylene0.15 to 0.4
RollersDryLubricated
Cast rollers0.50.4
Steel rollers0.40.3
Low-friction bushed rollers0.250.25

Material friction factors

Materialf2 (on steel)c (trough side)
Aluminium chips0.427
Ashes, coal, dry0.536
Ashes, coal, wet0.655
Bagasse0.4200
Cement, Portland0.6512
Cement clinker0.712
Coal, anthracite, sized0.425
Coal, anthracite, run of mine0.4520
Coal, bituminous, sized0.521
Coal, bituminous, run of mine0.5520
Coke, mixed0.5542
Coke breeze0.6536
Grains0.423
Gravel, dry0.4512
Gravel, run of bank0.611
Ice, crushed0.1534
Lime, pebble0.528
Sand, dry0.67
Sand, damp0.856
Stone, screened0.69
Wood chips, pulp logs0.448

Service factor

Load severityUp to 10 h/day24 h/day
Uniform1.01.2
Moderate peaks1.21.4
High peaks1.51.8

Speed factor

TeethEng./welded 50100150200300400 ft/minCast 50100 150 200 300 400 ft/min
61.42.02.94.4––1.62.32.35.0––
71.11.41.82.34.0–1.31.62.02.64.5–
81.01.31.51.82.53.61.21.41.72.02.94.2
91.01.21.41.62.02.61.11.31.61.82.32.9
100.91.11.21.41.72.01.01.31.41.61.92.3
110.91.01.21.31.51.81.01.21.31.51.72.1
120.91.01.11.21.41.61.01.11.31.41.61.9
140.80.91.01.11.31.41.01.11.21.31.51.7
160.80.91.01.01.21.30.91.01.11.21.41.5
180.80.90.91.01.11.30.91.01.01.21.31.5
200.80.90.91.01.11.20.91.01.01.11.31.5
240.80.80.90.91.01.20.90.91.01.11.21.3
05

Explanatory Notes

The method

The page follows the catalogue’s six steps: the class of conveyor, the total chain pull, the design working load, a tentative chain, the attachments and a check with the real chain weight. Steps 5 (attachment links) and the sprocket and drive choice are left to the catalogue.

Units

The formulas are printed in pounds, feet, inches and horsepower. The tool converts your metric entries, calculates in those units and converts the results to kN, kW and mm. Rounding can make a result differ slightly from a hand calculation in the catalogue.

Chains loaded

164 chains from the catalogue: 68 engineered steel with rollers, 34 engineered steel without rollers (including the elevator series), 32 welded steel, 23 cast and 7 drop forged. Each has the pitch, the rated working load, the weight per foot and, where printed, the recommended maximum speed with a 12-tooth sprocket.

Chains not loaded

Attachments, sprockets, buckets, the live-roller and double-flex chains and the combination, S-series drop-forged and some cast chains are not loaded. The ultimate strength is left out of the tool: where a printed value did not fit the working load it is dropped.

Drive chains

This page covers the conveyor and elevator method. The catalogue’s drive-chain selection tables (pages 94 to 102, by design horsepower and speed for 9, 12 and 15-tooth sprockets, with hub sizes) are not loaded. The Chain and Sprocket Selector handles roller-chain drives.

Speed

The catalogue gives the recommended maximum rpm of the chain for a 12-tooth sprocket and says to scale it by the teeth. The tool checks the chain speed against that, and the catalogue also says not to exceed 450 ft/min (137 m/min) for drive chain. The speed factor is not tabulated above 400 ft/min or for 6 and 7 teeth at high speed; the tool then shows no design load.

Cast and drop-forged speed factor

The catalogue’s speed-factor table has one column for cast chain and one for engineered and welded steel. The tool uses the cast column for drop-forged chain as well, which is the more severe. Ask the maker if that matters.

A printed value

In the speed-factor table the 6-tooth cast value at 150 ft/min (2.3) is no higher than the 100 ft/min value (2.3), and is lower than the steel value at 150 ft/min (2.9). The tool uses the table as printed. Avoid 6 teeth at speed.

Service factor and temperature

The catalogue prints the temperature factor in the same table as the load severity but does not say how to combine them. The tool multiplies them. Above 260 °C the catalogue says to contact Rexnord.

The class 3, 4 and 4A formula

The printed formula includes a term for material rubbing on the trough sides (h²X/c) even for carried material. The tool uses it as printed and it is zero if you set the material depth to 0.

Not covered

Take-up and catenary sag, wear strips, curved (double-flex) conveyors with their turn factors, reversing under load, and temperatures above 177 °C beyond a flag. For these, use the catalogue and the maker.

06

Sources

All figures were read from the Rexnord and Link-Belt Engineered Steel Chain catalogue (Conveyor, Elevator and Drive Chains, catalogue 468B, the 5050 edition) in October 2026. Confirm every chain and attachment with Rexnord before you order.

Method and factors

Design and Selection, pages 103 to 113: conveyor classes, the chain-pull formulas, friction factors, service and speed factors, the worked example and the bucket elevator formulas.

Chain data

Engineered steel with and without rollers (pages 10 to 14), welded steel (pages 36 to 40), cast chains (pages 47 and 50) and drop-forged chains (page 56).

Materials

Engineering Data, pages 124 and 125, for the typical weights of materials.